RegionalKnoxville, TN10 min read

Knoxville KUB July 2026 Commercial Water and Wastewater Rates

KUB’s July 2026 business schedules separate inside/outside service, fixed meter charges, tiered CCF volume, wastewater, multiple meters, and extra-strength treatment.

Direct answer

Effective July 1, 2026, KUB separates inside/outside service, meter charges, tiered water and wastewater volume, multiple-meter effects, and extra-strength wastewater. For a declared inside-city standard two-inch account, 100 to 80 CCF changes the included partial total from $2,167.70 to $1,778.70—a $389.00 modeled difference—while $246.00 in fixed charges remains unchanged. Strength and excluded lines need separate review.

1 CCF

Rate unit

748 gallons

Inside city

Declared class

One standard two-inch account

$246.00

Fixed charges

Declared water + wastewater total

$389.00

Modeled difference

Included lines at 100 → 80 CCF

Account-path map

Classify the KUB account before applying a rate

The July schedules do not support one generic commercial rate. Confirm service location, meter count and size, wastewater treatment, and strength status before using the declared example.

Classify the KUB account before applying a rate
Account factWhat the official schedules change
Inside or outside cityWater and wastewater use different customer charges and volume rates by service location.
One two-inch meterInside-city fixed charges are $135.00 for water and $111.00 for wastewater; outside-city equivalents are $150.00 and $122.00.
Multiple metersKUB applies customer charges by meter, so a property with several meters should not reuse the one-meter fixed total.
Water volumeSix CCF blocks apply. The rate rises through the middle blocks and falls at higher-volume blocks.
Wastewater volumeKUB generally uses water-meter volume, subject to separate-discharge and unmetered-service provisions.
Extra-strength wastewaterThe separate schedule lists BOD and suspended-solids thresholds and per-100-pound excess charges in addition to standard wastewater rates.

Who is affected

The July schedules cover commercial and industrial service

KUB’s official business-rate page and Resolution 1493 schedules identify nonresidential water, nonresidential wastewater, and extra-strength wastewater rates effective July 1, 2026. The standard schedules apply to commercial and industrial customers, but the correct price path depends on the account.

This page does not blend inside-city and outside-city rates. It also does not assume that one meter, standard-strength wastewater, or the declared two-inch service matches every property.

Fixed meter charges

Water and wastewater each carry a meter-based customer charge

For a two-inch meter, the monthly water customer charge is $135.00 inside the city or $150.00 outside. The corresponding wastewater charge is $111.00 inside or $122.00 outside. Those are separate fixed lines before volume charges.

The published schedules run from 5/8-inch through 12-inch meters, and KUB says accounts with multiple meters can receive a customer charge for each meter. The declared model therefore uses one two-inch meter and keeps its combined $246.00 fixed amount unchanged.

Water volume

Six CCF blocks set the nonresidential water charge

Inside-city water is $3.85 per CCF for the first 2 CCF, $6.25 for the next 8, $6.45 for the next 90, $6.25 for the next 300, $3.50 for the next 4,600, and $1.60 above 5,000 CCF. One CCF equals 748 gallons.

Outside-city water uses the same block sizes at $4.30, $6.95, $7.30, $6.95, $4.00, and $1.80 per CCF. Do not apply the inside-city example to an outside-city account or treat one block as a universal marginal rate.

Wastewater volume

Wastewater can amplify the usage-linked part of the bill

Inside-city wastewater is $4.15 per CCF for the first 2 CCF, $13.15 for the next 8, $13.00 for the next 90, $11.60 for the next 300, $9.40 for the next 4,600, and $5.60 above 5,000 CCF. Outside-city rates for those blocks are $4.55, $14.45, $14.40, $12.85, $10.35, and $6.10.

KUB generally bases wastewater quantity on water recorded by the meter, but the schedule includes provisions for customers whose discharge is separately measured and for unmetered water service. The actual account treatment controls; the model assumes the standard inside-city path.

Strength treatment

BOD and suspended solids are separate from standard wastewater volume

KUB’s extra-strength schedule lists applicability at biochemical oxygen demand above 2,000 pounds per million gallons, or 240 mg/L, and suspended solids above 2,500 pounds per million gallons, or 300 mg/L. Laboratory analysis determines the excess contribution.

The additional rates are $35.30 per 100 pounds of excess BOD and $33.75 per 100 pounds of excess suspended solids. Those charges are not in the standard model, and lower water volume does not by itself prove that pollutant mass or an extra-strength charge will fall.

Model boundary

Multiple meters and conditional lines need an actual-bill review

A property with multiple meters may have more fixed charges than the one-meter example. Outside-city service, wastewater exceptions, extra-strength treatment, fire service, the system-wide infrastructure charge, taxes, late charges, adjustments, and other account-specific lines also remain outside the partial totals.

Start with the bill’s service location, meter inventory, CCF, water and wastewater customer charges, volume blocks, and any strength line. Only then compare the statement with the current schedules.

Smart Valve analysis — declared partial-bill example

One inside-city standard two-inch account at 100 versus 80 CCF

One hundred CCF is 74,800 gallons; 80 CCF is 59,840 gallons. The calculation uses one two-inch meter, the inside-city standard water and wastewater schedules, and one comparable billing period.

Scroll the table horizontally to compare all columns.

One inside-city standard two-inch account at 100 versus 80 CCF
Included line100 CCF80 CCFDifference
Water: two-inch customer charge$135.00$135.00$0.00
Water: first 2 CCF$7.70$7.70$0.00
Water: next 8 CCF$50.00$50.00$0.00
Water: next 90 / 70 CCF$580.50$451.50$129.00
Wastewater: two-inch customer charge$111.00$111.00$0.00
Wastewater: first 2 CCF$8.30$8.30$0.00
Wastewater: next 8 CCF$105.20$105.20$0.00
Wastewater: next 90 / 70 CCF$1,170.00$910.00$260.00
Included partial total$2,167.70$1,778.70$389.00

The $389.00 is the sum of a $129.00 modeled water-volume difference and a $260.00 modeled wastewater-volume difference. The $246.00 combined fixed amount does not change. Strength, multiple-meter, outside-city, fire, infrastructure, tax, late, adjustment, and account-specific lines are excluded.

20% usage check

$389.00

Included-line modeled difference at 20% lower volume

For this declared standard account, moving from 100 to 80 CCF changes the included water volume by $129.00 and included wastewater volume by $260.00. The two fixed charges remain $246.00 in both columns.

Boundary: This is a partial-bill illustration, not a KUB bill quote or savings promise. It assumes one inside-city standard two-inch account and excludes multiple-meter effects, outside-city rates, wastewater exceptions, strength, fire, infrastructure, taxes, late charges, adjustments, and site feasibility.

Decision checklist

What to check first on the bill

  1. 1Confirm whether KUB classifies the service inside or outside the city.
  2. 2Inventory every water and wastewater meter and record each meter size.
  3. 3Match each fixed customer charge to the current water or wastewater schedule.
  4. 4Convert the billed volume correctly: 1 CCF equals 748 gallons.
  5. 5Allocate water and wastewater CCF across the published blocks instead of using one blended rate.
  6. 6Confirm whether wastewater follows water-meter volume or an account-specific exception.
  7. 7Identify any extra-strength BOD or suspended-solids line and its laboratory basis.
  8. 8Keep fire, infrastructure, tax, late, adjustment, and other conditional lines outside the declared model.

Scope boundary

Where Smart Valve realistically fits

Smart Valve may help a property team evaluate controllable metered water volume after service location, meter count and size, pressure conditions, operating uses, wastewater treatment, and the billing period are confirmed. Under the declared standard path, usage-linked wastewater can make the variable exposure larger than the water line alone.

Smart Valve does not change KUB’s fixed meter charges, service location, rate blocks, meter count, fire or infrastructure charges, taxes, penalties, or wastewater classification. It also does not establish that BOD or suspended-solids mass will fall with water use. No device fit or result is guaranteed.

Frequently asked questions

How many gallons are in one KUB CCF?

KUB’s schedules define one CCF as 748 gallons. The declared examples therefore represent 74,800 gallons at 100 CCF and 59,840 gallons at 80 CCF.

Does lower KUB water use reduce every bill line?

No. The declared example changes included water and standard wastewater volume lines. The $246.00 combined fixed amount remains, and conditional or account-specific charges are excluded.

How can multiple meters change a KUB commercial bill?

KUB applies customer charges by meter. A property with multiple meters may therefore have more fixed water or wastewater charges than the one-meter example.

Is extra-strength wastewater included in the $389.00 model?

No. The model uses standard inside-city wastewater volume only. BOD and suspended-solids excess charges require separate laboratory and account review.

When can KUB wastewater volume differ from metered water?

The schedule generally uses water-meter volume but includes separate-discharge and unmetered-service provisions. KUB’s actual account treatment controls.

Primary source trail

Sources and retrieval details

Knoxville Utilities Board: Business Water and Wastewater Schedule — Rates as of July 2026

Effective: July 1, 2026Status checked: July 20, 2026Retrieved: July 20, 2026

Official overview for current business water and wastewater service, units, inside/outside treatment, and links to the controlling schedules.

Source URL: https://www.kub.org/bills-payments/understand-your-bill/business-rates/business-water-and-wastewater-schedule/

Knoxville Utilities Board: Resolution No. 1493 — Nonresidential Water Schedule

Effective: July 1, 2026Retrieved: July 20, 2026

Controlling official schedule for commercial and industrial water customer charges, six inside/outside CCF blocks, multiple-meter treatment, and the 748-gallon CCF definition.

Source URL: https://www.kub.org/uploads/Water_Nonresidential_1.pdf

Knoxville Utilities Board: Resolution No. 1493 — Nonresidential Wastewater Schedule

Effective: July 1, 2026Retrieved: July 20, 2026

Controlling official schedule for commercial and industrial wastewater customer charges, inside/outside volume blocks, multiple meters, and wastewater-quantity provisions.

Source URL: https://www.kub.org/uploads/Wastewater_Nonresidential_1.pdf

Knoxville Utilities Board: Resolution No. 1493 — Wastewater Extra Strength Surcharge

Effective: July 1, 2026Retrieved: July 20, 2026

Controlling official schedule for BOD and suspended-solids thresholds, laboratory basis, and per-100-pound excess rates in addition to standard wastewater charges.

Source URL: https://www.kub.org/uploads/Wastewater_Extra_Strength_Surchrg_1.pdf

Rebuild the KUB account before modeling usage

Start with inside/outside status, every meter and fixed charge, CCF allocation, wastewater treatment, and any strength line. Treat $389.00 as a declared included-line model difference, not promised savings.